Entries by Ashawa Admin

TMP FOR COAL-FIRED POWER PLANT FOR ASHAKACEM

The Traffic Management Plan (TMP) project was carried out in Lafarge AshakaCem Coal-Fired Power Plant (CPP), Ashaka, Gombe State as part of a 5-part Post Impact Assessment 16mw project. The CPP will generate power for the cement factory using coal as fuel. The project commenced in November, 2017 and lasted for a period of two […]

EIA FOR LAFARGEHOLCIM ASHAKACEM COAL FIRED POWER PLANT (CPP)

Ashawa Consults Ltd. were commissioned to carry out an Environmental Impact Assessment (EIA) study for Lafarge AshakaCem Coal-Powered Plant in Gombe state, 2015. The objectives for this EIA were: To satisfy local, state, federal, and international rules and regulations on environmental issues relating to Energy projects. Acquire Baseline data of the environment as well as […]

EMP OF ASHAKACEM COAL-FIRED POWER – 2017

The project which was completed in September 2017, was an EMP conducted for AshakaCem’s 16 MW Coal-fired Power Plant (CPP) that is located within its existing premises in Gombe, Nigeria owned by Lafarge. This is in compliance with the statutory regulatory requirements for the approval of the Environmental Impact Assessment (EIA) report for the project. […]

ENVIRONMENTAL IMPACT ASSESSMENT FOR DANTATA AND SAWOE UGBA QUARRY, BENUE STATE.

Dantata & Sawoe Construction Company (Nigeria) Ltd. (D&S)  has  been  one  of  the  top construction companies in Nigeria for over 30 years. The company provides specialise services such as construction of airstrips, bridges, infrastructure, irrigation projects, highways and buildings to both government and private investors.   The quarry is located at Ugba, Mnchia, Logo Local […]

BASELINE ENVIRONMENTAL AUDIT FOR LAFARGE READY MIX PLANT ONNE, PORT HARCOURT, RIVERS STATE.

Lafarge Ready Mix Plant, Onne, Rivers State is a subsidiary of Lafarge Ready Mix Nigeria. It began operation in June 2014 in Rivers State’s Federal Ocean Terminal (FOT) facility where other industrial facilities are cited among which are the Port Harcourt Sea Port, Eni, Shell, Lafarge Atlas Cement etc. This project is a baseline environmental […]

ENVIRONMENTAL IMPACT ASSESSMENT OF JULIUS BERGER AKAMKPA QUARRY IN CROSS RIVER STATE

The quarry is located at Old Netim, in Akamkpa Local Government Area of Cross River State. It occupies an area of 92,897 Hectares, with approximately 46,446 hectares of land area being the quarry developmental area. The quarry project is being developed for the purpose of providing construction materials  for Julius Berger construction activities.        The EIA […]

EA OF 891 BTS ACROSS 25 STATES – 2016

This audit which was carried out across 18 states of the Federation was aimed at enabling IHS improve its environmental management system; establish the extent to which IHS is complying with relevant environmental standards; enable anticipation of environmental risks and plan responses; and minimize human exposure to HSE risks. The environmental compliance measures taken note […]

EIA OF 2,182 PROPOSED IHS BTS SITES ACROSS ALL 36 STATES & THE FCT – 2016

IHS Nigeria commissioned Ashawa Consults Limited to carry out Environmental Impact Assessment in 2,182 proposed BTS site in all the states of the Federation and the FCT. The objectives of the EIA for the proposed project are to: Satisfy local, state, federal, and international rules and regulations on environmental issues relating to the telecommunications industry; […]