TMP FOR COAL-FIRED POWER PLANT FOR ASHAKACEM
The Traffic Management Plan (TMP) project was carried out in Lafarge AshakaCem Coal-Fired Power Plant (CPP), Ashaka, Gombe State as part of a 5-part Post Impact Assessment 16mw project. The…
The Traffic Management Plan (TMP) project was carried out in Lafarge AshakaCem Coal-Fired Power Plant (CPP), Ashaka, Gombe State as part of a 5-part Post Impact Assessment 16mw project. The…
Ashawa Consults Ltd. were commissioned to carry out an Environmental Impact Assessment (EIA) study for Lafarge AshakaCem Coal-Powered Plant in Gombe state, 2015. The objectives for this EIA were: To…
These guidelines have been developed to guide the proponents of Nuclear Power Plant project in carrying out Environmental Impact Assessment (EIA) before the commencement of projects. The guidelines ultimately ensure…
The project which was completed in September 2017, was an EMP conducted for AshakaCem’s 16 MW Coal-fired Power Plant (CPP) that is located within its existing premises in Gombe, Nigeria…
Dantata & Sawoe Construction Company (Nigeria) Ltd. (D&S) has been one of the top construction companies in Nigeria for over 30 years. The company provides specialise services such as construction…
Lafarge Ready Mix Plant, Onne, Rivers State is a subsidiary of Lafarge Ready Mix Nigeria. It began operation in June 2014 in Rivers State’s Federal Ocean Terminal (FOT) facility where…
The quarry is located at Old Netim, in Akamkpa Local Government Area of Cross River State. It occupies an area of 92,897 Hectares, with approximately 46,446 hectares of land area…
A mandatory regulatory environmental audit is required to be undertaken every 3years in accordance with condition as provided in sections 21 of the S.I.9 regulations of 1991 on National environmental…
This audit which was carried out across 18 states of the Federation was aimed at enabling IHS improve its environmental management system; establish the extent to which IHS is complying…
IHS Nigeria commissioned Ashawa Consults Limited to carry out Environmental Impact Assessment in 2,182 proposed BTS site in all the states of the Federation and the FCT. The objectives of…