  • Ecological Fund Office
    1. Design and feasibility: Soil erosion and flood control project, Bamaina and Birnin Kudu Town, Jigawa State, December 2006
    2. Design and feasibility: Soil erosion and flood control project, Zango Kataf, Kaduna State, June 2006
    3. Design and feasibility: Soil erosion and flood control project, Kafanchan, Kaduna State, November 2005
  • Federal Ministry of Water Resources
    1. Hydrology and Hydrogeology; Dams and Reservoir Departments: Conceptualization, development and monitoring of projects e.g. Environmental Mitigation of Large Dams Project and design of meteorological stations. (2002 – 2014)
  • LafargeHolcim AshakaCem
    1. Hydrological Studies of the Gongola River (2014 – 2015)
      • To carry out hydrological study for water generation capacity increase from 128m3/hr. to 330m3/hr. (8,000m3/Day) from River Gongola.
      • To source, generate future additional water of 183m3hr. (4,400m3/Day) from the Gongola River to cope with envisaged coal power plant and clinker expansion capacity.
  • Bajoga Flood and Erosion Control Works: Study and design of drainage system from FCMB to Kesala bridge in Bajoga HQ of Funakaye LGA, Gombe State (2014)
    • The objective was to produce engineering solutions to mitigate or eliminate flood in the area.
    • The scope was to study the flood pattern around the area and design a drainage system with drainage length 1.5km.