TMP FOR COAL-FIRED POWER PLANT FOR ASHAKACEM

TMP FOR COAL-FIRED POWER PLANT FOR ASHAKACEM

The Traffic Management Plan (TMP) project was carried out in Lafarge AshakaCem Coal-Fired Power Plant (CPP), Ashaka, Gombe State as part of a 5-part Post Impact Assessment 16mw project. The CPP will generate power for the cement factory using coal as fuel.

The project commenced in November, 2017 and lasted for a period of two month. The objectives of the TMP are:

  • to improve routes of existing traffic system
  • achieve sustainable management that can provide traffic control devises
  • acquire useful information on the volume of traffic
  • classification of the vehicle size and capacity
  • the directional split to identify tidal flow on the routes, generate information that would enable effective design.